We're basing the schedule on the first page of our shot lists which contains all of the interior shots and their timeings. This is the break down of shots and their estimated lengths of time:
10.00 - Actor and film crew arrive with camera equipment and enthusiasm
10.10 - A run down of shots to film
10.20 - Set up camera equipment
10.10 - A run down of shots to film
10.20 - Set up camera equipment
10.30 - Film first track shot (1-3 s)
10.45 - Film close up of characters (4-5 s)
10.50 - Film over the shoulder of artist (6-7 s)
10.55 - Film stop motion of character's heads moving (8-9.5 s)
11.20 - Film artist grabbing characters (9.5-11 s)
11.25 - Film artist opening curtains (22-24 s)
11.35 - Film final shot of artist slamming front door and leaving (28-30 s)
11.45 - Look over shots and refilm some if necessary
12.00 - Pack up and leave
Tim, we made need to possibly maybe make this an hour earlier? I start work at 1! :(
ReplyDelete