Wednesday, 13 October 2010

Shot Schedule for Interior Shots 17-10-10

The first part of a draft filming will be completed on Sunday the 17th of October and do make sure we get as much filmed as possible we have devised a shot schedule which has taken into account time for shots, preparation and discussing how to film. The section we're filming are the interior shots which are mainly around my house (or for better clarification Tim's house) and the garage attached. This section of music video may only be 18 seconds but we're going to apply this amount of detail to every day of filming to ensure the best results in the time we have. The reason for such a small amount of filming to be done on one day is purely because of availability and how busy we all are during half term and the week before but as we've got roughly 3 weeks to get the first draft done we're not breaking a sweat.


We're basing the schedule on the first page of our shot lists which contains all of the interior shots and their timeings. This is the break down of shots and their estimated lengths of time:

10.00 - Actor and film crew arrive with camera equipment and enthusiasm
10.10 - A run down of shots to film
10.20 - Set up camera equipment
10.30 - Film first track shot (1-3 s)
10.45 - Film close up of characters (4-5 s)
10.50 - Film over the shoulder of artist (6-7 s)
10.55 - Film stop motion of character's heads moving (8-9.5 s)
11.20 - Film artist grabbing characters (9.5-11 s)
11.25 - Film artist opening curtains (22-24 s)
11.35 - Film final shot of artist slamming front door and leaving (28-30 s)
11.45 - Look over shots and refilm some if necessary
12.00 - Pack up and leave